THIS WEEK’S CONSTRUCTION-RELATED CLOSURES

I-10 – Seguin

  • Tuesday, January 17. 9 a.m. until 4 p.m. Westbound main lanes between Business 123 and the Huber Road overpass. The right lane will close while crews move barrier.

  • Tuesday-Wednesday, January 17-18. 9 a.m. until 4 p.m. daily. Eastbound main lanes between US 90 and FM 465. The right lane will close while crews repair signs. This closure includes the ramps to US 90 and FM 725, as needed. Traffic will take the next available ramp and turn around.

I-10 – East San Antonio

  • Until Monday, February 20. 8 a.m. until 4 p.m. daily. Frontage road on the westbound between Foster Road and FM 1516. Alternating lanes will close as needed while crews work on underground drain structures. This frontage road is a two-way frontage road and traffic control officers will direct traffic during these closures.

I-10 – Northwest San Antonio

  • Tuesday-Friday, January 17-20. 9 p.m. until 5 a.m. nightly. Main lanes, both directions, at Fair Oaks Parkway. Alternating lanes will close while crews move barrier.

I-35 – New Braunfels

  • Tuesday, January 17. 10 a.m. until 3 p.m. Southbound main lanes at York Creek. The left lane will close while crews work on guardrail.

  • Wednesday, January 18. 9 a.m. until 3 p.m. Northbound main lanes at York Creek. The left lane will close while crews work on guardrail.

I-35 – Northeast San Antonio

  • Thru Friday, from 9 p.m. until 5 a.m. nightly. Main lanes, both directions, between Walzem and Rittiman roads. Alternating lanes will close while crews widen the road and work on overhead highway signs.

  • Sunday-Friday, January 15-20. 9 p.m. until 5 a.m. nightly. Frontage road, both directions, between Walzem and Rittiman roads. Alternating lanes will close while crews do road work.

  • Sunday-Friday, January 15-20. 9 p.m. until 5 a.m. nightly. Northbound exit ramp to westbound I-410. Alternating lanes will close while crews work on barrier.

  • Sunday-Friday, January 15-20. 9 p.m. until 5 a.m. nightly. Southbound exit ramp to southbound I-410. The ramp will close while crews move barrier. Traffic will exit George Beach, turn around and enter southbound I-410 from the northbound frontage road of I-35.

  • Thru Friday,. 9 a.m. until 3 p.m. daily. Northbound main lanes between George Beach and Rittiman roads. The left lane will close while crews work on drainage.

  • Thru Friday, from 9 a.m. until 3:30 p.m. daily. Frontage road, both directions, between Walzem and Rittiman roads. Alternating lanes will close while crews do road work.

I-410 – Northeast San Antonio

  • Sunday-Friday, January 15-20. 9 p.m. until 5 a.m. nightly. Eastbound exit ramp to northbound I-35 and Randolph Boulevard. The right lane will close, including the ramp to Randolph Boulevard, while crews work on barrier. Traffic will exit Thousand Oaks and turn around to reach Randolph Boulevard and the city of Windcrest.

  • Sunday-Friday, January 15-20. 9 p.m. until 5 a.m. nightly. Eastbound entrance ramp from Austin Highway. The ramp will close while crews move barrier. Traffic will follow the posted detour route.

I-410 – Northwest San Antonio

  • Current until April 2017. Northbound exit to Culebra Road. The exit will close while crews widen the main lanes and frontage road. Traffic will exit Ingram Road, turn around and get to Culebra on the southbound frontage road.

  • Monday-Friday, January 16-20. 9 a.m. until 4 p.m. daily. Northbound frontage road between US 90 and Marbach Road. The right lane will close while crews set barrier.

  • Monday-Friday, January 16-20. 9 p.m. until 5 a.m. nightly. Southbound main lanes between Culebra Road and Hwy 151. The right two lanes will close while crews set bridge beams.

U.S. Hwy 281 – North-central San Antonio

  • Monday-Friday, January 16-20. 11 a.m. until 3 p.m. daily. Main lanes, both directions, between I-35 and I-410. The two right lanes will close while crews do concrete work. This includes ramps as needed. Traffic will follow posted detours.

  • Monday-Friday, January 16-20. 9 p.m. until 5 a.m. nightly. Main lanes, both directions, between Airport and Josephine. The two right lanes will close while crews work on guardrail. This includes ramps as needed. Traffic will follow posted detours.

Loop 1604 – Northwest San Antonio

  • Saturday, January 14 at 4 a.m. until Sunday, January 15 at 7 p.m. Southbound connector ramp to eastbound Hwy 151. The direct connector will close while crews lay asphalt. Traffic will turn around at Wiseman Boulevard and use northbound Loop 1604 to reach eastbound Hwy 151.

Other roads – Seguin

  • Wednesday, January 18. 9 a.m. until 4 p.m. FM 78 (New Braunfels Avenue), both directions, at I-10. All lanes will close while crews set bridge beams overhead. Traffic will use Hwy 46 to reach its destination.

Other roads – Northeast San Antonio

  • Thru Friday, 9 p.m. until 5 a.m. nightly. Randolph Boulevard, both directions, at I-35. Traffic will be reduced to a single lane, controlled by traffic officers, while crews work on bridge rail overhead.

All closures are pending weather.

 

 

Advertisement